Next February 12, 1997
Previous January 29, 1997
Return to CSuite Workshop Index
Agenda:
David Benoit and Carrie Gates presented a demo of 
progress on their jitMail system, which will provide 
delivery of bulk messages as each user logs in.  Those following the 
development activities will recognize this as the evolution of the 
previous "bulk mail" project, with a name that more clearly represents 
its purpose.
Return to Topic List
- Pine
- Translation much slower than expected :(
- Problems handling variable substitutions, as the alternate language 
syntax might locate the variables differently from English, and handle 
pluralization differently.
- Apache
- Carrie Gates reported that 
version 1.2b4 is running as main httpd on csuite.chebucto.ns.ca, with 
language preference recognition.  She is working on internationalization 
of Apache's user messages.
- Lynx Setup Page
- The version of lynx in csuite:~jkeast/lynx2-6/lynx has 
the new Forms-based Setup page, for testing.  The version is otherwise, 
at this date, raw lynx 2-6.
- Translation
- login as visiteur on csuite
- Set character-set in lynx appropriate to your terminal emulation's 
capabilities.  On a Macintosh, probably use Mac 8-bit, on a PC use 
appropriate Code Page to correspond with your display setting.
- Only this version of lynx has been internationalized.
- Start Page
- no progress
- plan to make a Grand Transition on CCN after 1.0 release 
- including
- Start Page, 
- Lynx 2.6 International, 
- Pine 3.95 international, 
- translated pages
 
- Passwd / quota / zmailer
- shared library is built
- passwd looks at shadow password file
- Zmailer
- router still dumps core
- CSuite Database
- Andrew Dacey is building forms to report system configurations on 
which CSuite is successfully built, along with bug report forms.
- A user list will help us to be more pro-active in follow-up with the 
user community.
- It was suggested that MSQL be used as a "proper database engine" to 
handle this requirement.
- uname -aand the Posix interfaces can be used to 
retrieve most of the configuration data needed for the database.
- Testing
- Some tests require parts of several branches to create a successful 
logical test.
- Make is under consideration as the tool to control those tests.
- Make session planned for Thursday February 6.
- Function deadline
- Monday February 10 was named as the deadline for adding functionality 
to beta 1.0
- Then full testing, bug fixing and finalize install procedures.
- Support
- Database
- Support center plan
- David 
Potter will investigate the RUST problem tracking system and report.
Return to Topic List
Next Workshop February 12, 1997
Previous Workshop January 29, 1997
Return to CSuite Workshop Index
Submitted by Ed 
Dyer aa146@chebucto.ns.ca
Workshop Coordinator David J Murdoch djm@chebucto.ns.ca